A quote is only as good as the price on it. Too high and you lose the work; too low and you win jobs that quietly cost you money. Most underpricing comes from leaving out time and overheads rather than from charging too little per hour. This guide shows how to build a price from your real costs. Once you have the figure, put it in a professional document with the quote generator.
Quick answer: Price a job as: labour (realistic hours × your true hourly cost) + materials (with a markup, often 10% to 30%) + a share of your overheads + contingency (often 5% to 10%) + profit. Work out your true hourly cost by dividing your yearly costs and target income by your billable hours, not your working hours. Then check the total against the local market. A margin of 15% to 30% on the total cost is common for trades, and remember that markup and margin are not the same.
The five building blocks
| Part | What goes in | Common mistake |
|---|---|---|
| Labour | Hours on site plus travel, preparation, clean-up and admin | Pricing only the hours you expect to be on the tools |
| Materials | Supplier price plus waste, delivery and a markup | Passing materials on at cost |
| Overheads | Insurance, vehicle, tools, phone, software, accountant | Forgetting them entirely |
| Contingency | Allowance for things going wrong | None, so every surprise comes out of profit |
| Profit | What the business earns on top of costs | Treating your wage as the profit |
Step 1: find your true hourly cost
Start with billable hours, not working hours. Take 52 weeks, remove holidays, bank holidays, likely sick days and quiet periods, then allow for time spent quoting, buying materials and doing paperwork. Many sole traders bill 1,200 to 1,500 hours a year, not 2,000.
Example: you want to pay yourself £40,000 a year and have £12,000 of overheads. With 1,400 billable hours, your break-even rate is (£40,000 + £12,000) ÷ 1,400 = about £37 an hour. Anything below that and you're paying to work.
Step 2: build the quote
A bathroom refit estimated at 3 days (24 hours including travel and clean-up) with £1,800 of materials:
| Item | Calculation | Amount |
|---|---|---|
| Labour | 24 hours × £37 | £888 |
| Materials | £1,800 + 15% markup | £2,070 |
| Waste removal and skip | Supplier price | £250 |
| Contingency | 5% of £3,208 | £160 |
| Total cost | £3,368 | |
| Profit | 20% margin on the price: £3,368 ÷ 0.8 − £3,368 | £842 |
| Price before VAT | £4,210 |
If you're VAT-registered, add 20% VAT and show both figures. Note the profit line: adding 20% to costs gives a markup of 20% but a margin of only 16.7%. To earn a 20% margin, divide costs by 0.8. The markup vs margin guide explains the difference.
Step 3: check against the market
- Compare with what local competitors charge for similar work, and with your own past jobs.
- If your price is well above the market, look at your hours and overheads before cutting the profit.
- If it's well below, you may be underestimating the time.
Pricing mistakes to avoid
- Not tracking actual hours against estimates. A few months of records will show where your quotes leak money.
- Discounting to win the job without removing anything from the scope.
- Vague scope. List what is and isn't included, so extra work becomes a priced variation.
- Old prices. Update material prices and your hourly rate at least once a year.
Check your rate with the freelance rate calculator and your margin with the profit margin calculator. Once the job is done, get paid on time with late payment rules for invoices. More tools are in the finance calculators guide.
Figures are examples only. Rates vary by trade and region.
Frequently asked questions
How do I work out the price of a job?
Add labour at your true hourly cost, materials with a markup, a share of overheads and a contingency, then add your profit margin.
How much should I mark up materials?
Many tradespeople add 10% to 30% to cover collection, waste, storage and the risk of supplying them.
What profit margin should a tradesperson add?
Around 15% to 30% on top of total costs is common, depending on the trade, the risk and local demand.
How many billable hours are there in a year?
For many sole traders, 1,200 to 1,500 once holidays, quiet periods, travel and admin are taken out.
Should I add contingency to a quote?
Usually yes, around 5% to 10%, so unexpected problems don’t wipe out your profit.
Is a 20% markup the same as a 20% margin?
No. A 20% markup on cost gives a margin of about 16.7% of the selling price.
Sources
- Markel: How to price a job as a tradesperson
- Trade job costing guide (UK)
- How to make your trade business more profitable
- Simply Business: Quote template for contractors
Last updated: